Demolition: Part 2

Floor: Yesterday the floor guy did his very best to demo the tile floor in the kitchen. It looked like a real struggle. That tile looks like it was bonded to that sub floor for life! I talked to him this morning and he said it was a killer. The plan is to have the floor finished by Sunday! I can’t wait!

We got rid of the old white fridge in a bit of a panic. The day before the floor demolition started we realized we didn’t want to move the old fridge into the living room. It would thaw out and most likely leave a rotten puddle where ever we put it. Kate put the fridge for sale on a site called swap and in and hour there was a Mexican family over at the house to pick it up. Everyone came along. I was ready to help move the fridge but the guys took one look at me and laughed. They exchanged some words in Spanish of which I can only assume were flattering to me.

They had the fridge out in no time and into their van. Moments later the door bell rang and there was a request for jumper cables. They left the lights to the van on while we moved the fridge. Owning my own van I had cables at the ready and we had that van jumped in 5 minutes. So glad to get that fridge out of the way. We have one in the basement we are using for the moment. The new one will be here early next week.

All in all things are progressing well. Lots more to do!



See the crazy bonding agent by the door. It must have been a buster to get that tile up!

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.